Cranes to Cairo North Power Station


Crawler Crane Demag PC / CC4200

Crane Gottwald AMK500-93 wark
Cairo North  Power Station
One of the largest power production plants in Cairo, Egypt
The plant has performed renovations, maintenance and expansion using large equipment suitable for this work.
Our company provided this equipment with highly efficient team which was very successful with great success as well.
These equipment were:
Crawler Crane Demag PC / CC4200
and
Crane Gottwald AMK500-93

Crane Gottwald AMK500-93

North Cairo rent Power Station
The plant was completely renovated by:

Crawler Crane Demag
PC/CC4200

Crane Gottwald AMK500-93

AND

Crane Liebherr LT1160

Crane Liebherr LT1160

plant was completely renovated using our company equipment.

In a required time our company provides cranes for the customer with what suits for him and suits the work, in high safety regulations, smoothly and speed.
Installed Capacity
4Gas Turbine×250+2Steam Turbine×250 = 1500MW  Commercial Operatio: first stage 2004 - second stage 2007 Consultant PGESCO Contractors
MITSUBISHI,HITACHI,NEM,SIEMENS Fuel Type Dual Fuel(Natural gas as a main fuel - Fuel oil as reserve fuel) security
The station is electronically secured by cameras on the outside fence .
* Five companies produce electric power in the Arab Republic of Egypt follow to the Egyptian Electricity Holding Company, which is following to Ministry of Electricity and Energy.
* Cairo electricity production Company contributes by 20% of the total electrical energy produced by the production companie The company's capital is 327.32 million Egyptian pounds, and the Egyption Electricity Holding Company owned this capital totally and registered in the Commercial Register under No. 340363 Cairo.he project consists of (2) Modules each capacity is 750 MW combined-cycle, module consist of (2) gas turbine each capacity is 250 MW and (1) steam turbine capacity of 250 MW in addition to Module third the capacity of 750 MW and the project is implemented system packages with a number (17) Packages. The project cost :Total estimated cost for (2) Module 7.121 billion pounds, equivalent to 1.028 billion dollars + cost estimate for the third Module 3.611 billion pounds, equivalent to 626 million dollars.Sources of funding for (3) Modules :
* European investment bank With 300 million euro
* International bank for reconstruction and development With 600 million dollar
* OPEC fund for International development With $ 30 million
* The company will finance the rest of the cost from its self resources with $ 20 million  .
-->